      <title>WP144: Iterative Formalization of Smallest Workface Boundary for Generating Daily Bills of Materials</title>
    </titleInfo>
    <originInfo>
      <dateCreated keyDate="yes" encoding="w3cdtf">2019-01</dateCreated>
    </originInfo>
    <typeOfResource>text</typeOfResource>
    <abstract>A study on 831 daily work orders collected from five construction sites showed that a foreman can generate a bill of materials (BOM) quickly for daily work orders consisting of engineered-to-order (ETO) materials but that for daily work orders consisting of made-to-stock (MTS) materials, the process can be time consuming (e.g., 12-68 minutes per daily BOM). To help a foreman expedite the speed of generating a daily BOM consisting of MTS materials, this research develops a concept referred to as a smallest workface boundary (SWFB) - a boundary that encapsulates a set of level of development (LOD) 400 elements in the smallest workable unit for a certain trade with the objective of assisting a foreman in quickly generating a daily BOM. Through iterative field studies at a lab and nine construction sites, the concept of SWFB was developed, tested with foremen, and incrementally improved to speed up the process of generating a daily BOM for a foreman. With the latest version of the prototype, foremen were able to generate a daily BOM in 59 seconds on average.</abstract>
    <note type="preferred citation" displayLabel="Preferred Citation"/>
    <note type="citation/reference" displayLabel="Related Publication"/>
    <note type="contact" displayLabel="Contact">cife-email@stanford.edu</note>
    <relatedItem>
      <titleInfo>
        <title/>
      </titleInfo>
      <location>
        <url/>
      </location>
    </relatedItem>
    <genre authority="marcgt">technical report</genre>
    <name type="personal">
      <namePart>Song, Min</namePart>
      <role>
        <roleTerm authority="marcrelator" type="text">Author</roleTerm>
      </role>
    </name>
    <name type="personal">
      <namePart>Fischer, Martin</namePart>
      <role>
        <roleTerm authority="marcrelator" type="text">Author</roleTerm>
      </role>
    </name>
    <subject>
      <topic>CIFE</topic>
    </subject>
    <subject>
      <topic>Center for Integrated Facility Engineering</topic>
    </subject>
    <subject>
      <topic>Bill of materials</topic>
    </subject>
    <subject>
      <topic>Daily work order</topic>
    </subject>
    <subject>
      <topic>Building information modeling</topic>
    </subject>
    <subject>
      <topic>Level of development</topic>
    </subject>
    <subject>
      <topic>Smallest workface boundary</topic>
    </subject>
    <relatedItem type="host">
      <titleInfo>
        <title>CIFE Publications</title>
      </titleInfo>
      <location>
        <url>https://purl.stanford.edu/xs573nh8717</url>
      </location>
      <typeOfResource collection="yes"/>
    </relatedItem>
    <accessCondition type="useAndReproduction">User agrees that, where applicable, content will not be used to identify or to otherwise infringe the privacy or confidentiality rights of individuals. Content distributed via the Stanford Digital Repository may be subject to additional license and use restrictions applied by the depositor.</accessCondition>
  </mods>